Why most digital marketing agencies fail at kitchen cabinet marketing.
Cabinet making sits between a per-foot price, a showroom visit that decides the job, and a festive calendar that swings enquiries 40 points in four weeks. Generic playbooks miss all three. Our SEO agency page explains the methodology.
A per-foot price, not a project price
Melamine quotes around RM 250 to RM 380 a running foot, plywood RM 380 to RM 560, aluminium 4G RM 480 to RM 780. A 22-foot wet-and-dry kitchen lands near RM 18,600. Show no band and the homeowner assumes the highest.
Registration is a shortlist question
Renovation is construction work, and contractors are expected to hold CIDB registration under Act 520 at a grade covering the contract value. Homeowners burnt by a runaway deposit now check this before the site measurement, so we put it where they look.
Three days, five weeks, or a quarter
A table-top replacement is decided in about three days on price and stock. A full kitchen runs two to six weeks through a 3D drawing, a showroom visit and three quotations, and a developer package a quarter or longer. Three clocks, three campaigns.
Six job types, six average tickets
Kitchen cabinets, wardrobes, table tops, refacing, carpentry and developer packages average RM 4,200 to RM 145,000 a job. One blanket campaign sends a condo owner replacing a quartz top and a developer fitting out 60 units to the same page.





























